It explains why two quotes differ
Usually surface preparation. One supplier has priced the work the wall needs; the other has priced the printing and will raise the rest later.

Interactive tool
You will not find a price on this page, and it is worth saying why up front. Ink Blend quotes per wall rather than from a rate card, and a figure produced by a form that has never seen your surface would be a guess wearing a suit. What this page does instead is more useful: it tells you which specific things about your project will push the number up or down, and it lets you run a ten-year comparison using the quotes you have actually been given.
Answer all five to see what drives your quote.
Optional — compare over 10 years
Enter what you have actually been quoted and how long you expect each option to last. We supply the arithmetic and nothing else — there are no figures of ours in here, which is exactly why you can trust the output. Use whatever currency you were quoted in.
A printed wall
The alternative
Vinyl, wallpaper, repainting — whatever you are weighing it against.
Fill in all four fields to see the comparison.
What this means in practice
Usually surface preparation. One supplier has priced the work the wall needs; the other has priced the printing and will raise the rest later.
The comparison takes the figures you have been quoted. We supply the arithmetic and nothing else, which is why you can trust the output.
A cheaper option reapplied every few years stops being cheaper at some point. The tool tells you which year that happens in your case.
The drivers come back ordered by how much they matter, so you know which conversation to have before you ask anyone for a number.
Have those details to hand? That is everything we need to give you a real answer.
Send them nowPlenty of competitors publish a per-square-foot figure, and it is a fair question why this page does not. The straightforward answer is that Ink Blend has not published rates, and inventing a number to fill the gap would be worse than leaving it empty. A range presented on a supplier's own site reads as that supplier's price, whatever the small print says, and a visitor who anchors on a figure we made up is being misled even if every word around it is hedged.
The second reason is that per-square-foot pricing describes the printing and not the job. Two identical walls where one needs filling and sealing and the other does not are genuinely different pieces of work, and any rate quoted before someone has looked at the surface is going to be revised. Where a supplier's headline rate is very low, the preparation is usually where the difference reappears.
So this page does the thing that is actually useful without a number attached: it tells you what will move yours, in order, so you can sort out the expensive unknowns before you ask anyone for a figure.
The comparison is where a printed wall either justifies itself or does not, and it depends entirely on numbers only you have. So the tool asks for them. Enter what you have been quoted for each option you are weighing, along with how long you expect each to last before it needs doing again, and it works out the cumulative position across a decade.
The mechanic that matters is repetition. An option that costs less up front but has to be redone every few years accumulates, and at some point the cumulative lines cross. The tool reports that year explicitly, because "cheaper" and "cheaper over the period you will own the space" are frequently different answers — and which one applies depends on your lease, your plans and how long you intend to look at the wall.
We supply no figures at all here, including no default lifespans. How long any finish lasts depends on preparation, traffic, light exposure and maintenance, and a supplier asserting a number for a wall they have not seen is guessing. Use your own quotes and your own honest expectations, and the arithmetic will be sound because the inputs are yours.
Three things make the difference between a quote you can rely on and a number that moves later. First, measure the wall properly — full width and height, and everything interrupting the face: recesses, returns, switch plates, thermostats, existing signage. Second, establish the surface, ideally by running the Wall Readiness Check, because preparation is the variable most likely to change a figure after the fact.
Third, sort out the approvals. If you lease, find out whether the landlord has to consent and what the reinstatement clause requires. If a board or committee decides, find out when they next meet. Neither of these changes the price directly, but both routinely turn a straightforward project into a stalled one, and starting them early costs nothing.
Do those three and the quote you get back will be specific rather than provisional. It also makes you much harder to quote badly, because a supplier can see you already know what the job involves.
Context
Reference imagery showing the sorts of rooms and surfaces this work sits in. These are not Ink Blend projects — each caption describes what the photograph actually shows.



FAQs
Because Ink Blend has not published rates, and a range on a supplier's own site reads as that supplier's price no matter how it is captioned. A visitor anchoring on a number we invented is being misled even if every word around it is hedged. The honest version of this page is one that tells you what moves your number instead.
Most often surface preparation. One has looked at the wall and priced the filling, sealing or flattening it needs; the other has priced the printing and will raise the preparation later. Ask both explicitly what surface work is included. Where a headline rate is unusually low, that is normally where the difference reappears.
Whatever you have actually been quoted, and your own honest expectation of how long each option lasts before it needs redoing. Do not use figures from the internet — the whole value of the comparison is that the inputs are real and specific to your wall, your building and your quotes.
Far less than people expect. This is not screen printing, so the number of colours is not the driver it would be there, and a photograph and a flat graphic of the same size are much closer than most assume. What does cost more is artwork origination — if the image has to be created rather than supplied, that is a distinct piece of work.
No. It is arithmetic on the numbers you entered, including the lifespans you supplied. If your assumption about how long something lasts is wrong, the break-even year moves with it. Treat it as a way of testing your own assumptions rather than as a forecast of what will happen.
Run the profile, then send it with your wall photographs and measurements. A message that already answers the surface, access, artwork and approvals questions gets a specific reply. One that says you have a wall and would like a price gets a request for exactly that information first.
Get a quote
The planner writes your answers into a summary. Attach it to your enquiry with wall photographs and measurements and you will get a specific answer rather than a request for more detail.
Or reach us another wayStart with a wall photo
Send photos, measurements, and a rough idea. Ink Blend will map the fastest path from concept to quote.